K-Catalog
Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets
  • Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets
  • Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets
  • Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets
  • Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets
  • Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets

STAPLES

Staples Arc Notebook Project Planner Filler Paper, Letter-sized, White, 50 Sheets

See current price

Check the current price and availability on Amazon.com.

View on Amazon

Affiliate link — we may earn a commission at no extra cost to you. Learn more

Brand
STAPLES
Item Weight
4.8 ounces
Item model number
886407
Color
White

Key features

  • Sold as 50/Pack.
  • Arc System project planner premium refill paper let you refill your notebook
  • This 8.5"W x 11"L (US letter) refill has 50 sheets
  • College-ruled for efficient use of space
  • White refill paper

Specifications

ManufacturerStaples
BrandSTAPLES
Item Weight4.8 ounces
Item model number886407
ColorWhite
ShapeRectangular
Material TypePaper
Sheet Size11-x-8.5-inch
Manufacturer Part Number886407
MaterialPaper
ASINB00K6P3BGE

About this product

The Staples® Arc system letter-size premium refill paper in white measuring 8-1/2" x 11" contains 50 project-planner sheets to hold all of your great ideas.The Arc system premium refill paper in white features heavyweight, letter-size paper. This paper measures 8 1/2"x 11" and has 50 repositionable, project-planner sheets.

Similar products

See current price

View on Amazon